Assembly • Vecoplan AG

ANY SCREW FITS - PROFESSIONAL ASSEMBLY ON SITE

The Vecoplan product portfolio requires a thorough knowledge. Vecoplan fitters love their technically demanding and versatile profession and they know every detail of our machines and equipment. With a qualified, well-trained team of specialists for electrical engineering and mechanics, we offer our customers professional implementation of their construction projects.

A high standard of quality and timing is the basis for the successful and precise work of our experienced and worldwide-operating assembly supervisors and skilled fitters. Our competence, reliability and quality on site are particularly important in complex plant construction. Vecoplan customers can be assured with the assembly crew on site, the construction progress is constantly monitored and prompted, the complete documentation is prepared and all working and safety conditions are taken into account. 

We offer:

  • Construction Site Management
  • Specialised personnel
  • Organisation of site set up and lifting devices
  • Preparation of risk and hazard analysis
  • Decades of assembly experience worldwide
  • Safety and health coordination
  • CE-compliant documentation

Your benefits:

  • All from one source
  • Risk minimisation
  • Securing investment and profitability
  • Maximum operating safety
  • Production and process optimisation 

Current assempley project

  • Assembly

    The steel structure is getting assembled

  • Assembly

    Pre- assembling steel structure

  • Assembly

    The assembley team upload the feeding conveyor for the drum chipper…

  • Assembly

    The logyuard - including the drum chipper - is getting installed

  • Assembly

    Installation of the future separating hall

  • Assembly

    Screening building installation is in progress

  • Assembly

    Installation of stationary crane

  • Assembly

    Preparation of disc screen

  • Assembly

    Pre-assembling of chain conveyor

  • Assembly

    Lifting of conveyor in boiler house

  • Assembly

    Safe on 36mtr. level

  • Assembly

    Scraper floors installed

  • Assembly

    Log yard control cabin

  • Assembly

    Installation magnet seperator

  • Assembly

    Vecoplan assemblers: a strong team on-site

Project: Burmeister & Wain Scandinavian Contractor (BWSC)

Installation service and duration:

In use:

Planning, manufacturing, delivery, installation and commissioning of a complete chipper line including a complete preparation line with boiler feeding for a biomass heating plant with a throughput of 27.8 MW electrical.

Fuel: 85 % self-produced fresh wood chips, 15 % mix of used timber and saw mill waste

  • Start of installation: 06.07.2017
  • Scheduled duration max. 90 working days
  • Approx. 4 weeks  electrical installation
  • Scheduled warm startup January 2018 
  • Mobile cranes with a crane class of up to 250 tons  
  • Telehandler 8 tons
  • Roto Telehandler (360°) 5 tons

To implement this project more than 50 truckloads of material (simple distance Bad Marienberg – Kent approx. 700 km) are transported by land and sea (also through the Eurotunnel of the English channel).